In March of 2017, All Coast Recyclers suffered a major flood that destroyed the access road, damaged dam levies and flooded vital plant on site with several machines submerged in water.

AllightSykes pump specialists were engaged to conduct a site audit, cost benefit analysis on hire equipment usage and maintenance expenses to propose a customised pump solution for the client. The goal was to proceed with site installation and construction works to reduce their long-term energy consumption, gas emissions and overall costs.

After consultative meetings with the site engineers, AllightSykes recommended a skid mounted HH130i compressor prime dewatering pump with CAT C7 diesel engine. This included a drop discharge c/w geared butterfly valve, no flow shutdown with galvanised engine canopy and S27 enclosed control panel.

The Pump was required to support a precision screen SRD180 wash plant duty point 50 lps (litres per second) at 70M TDH (total dynamic head), with 75 metres of lay flat pipe that feeds the machine with a designed suction lift of 4m that changed with the dam conditions from 2 to 4.5 metres. In addition, the system could change based on dam levels, location of the wash plant and product being processed.

The HH130 gives the client the capability to upscale their output process for future demand. The ability to remotely monitor the pump, saves operators from accessing the site in extreme conditions which leads to improvements in their safety systems.

AllightSykes main objective was offer a cost-effective solution, reducing CO2 emissions and maintenance time. By removing two of the three hire pumps on site, which were diesel driven, incorrectly sized with old air compressor and faulty flow meters, the total lifecycle costs will be significantly improved.

Additionally, our project team’s aim was to guarantee water flow to the dewatering machine with no down time. Any stop in production would cost the company $40,000.00 per hour. By designing the HH130i pump with up scaled capability in mind it allowed the site manager to install more equipment with higher production level without interruptions.

Despite the torrential rain, the pipe line cut in time frame went to plan and the pump performed exactly as designed, reporting excellent results. Once the pump ran up to speed the pressure tests confirmed the required duty point was met with a lower fuel consumption achieving project goals.

The project was closed on the 14th of June with our client extremely happy with AllightSykes technical advice and communication throughout the process. “AllightSykes Pump performance is far greater than expected and the plant is running perfectly. The service support from AllightSykes and the technical team have been great” – reported Clint Cumner, All Coast Recyclers’ Site Manager.

For more information on ​our full range of pumps, please email sales@allightsykes.com or visit our website.

contact us

RECENT NEWS POSTS

The Industries we Serve

mining
Mining
Construction
Construction
Agriculture
Agriculture
Utilities
Utilities

WHY ALLIGHTSYKES?

award icon

TALK DIRECTLY WITH
THE ENGINEERING EXPERTS

If customisation requirements are what you are after, we have a team of in-house engineers and technical experts who can work with you to develop bespoke solutions for your requirements.

diamond icon

PREMIUM BUILD
SPECIFICATION

We provide Australian made, robust and reliable products for the most challenging and demanding applications. Our in-house engineering team can custom-design and manufacture bespoke equipment to match any specification supplied.

dollar icon

LOW OPERATION
AND MAINTENANCE COSTS

We believe in optimising efficiency and reducing downtime to make ownership safe, simple and cost-effective for you. We have refined our product range through design, manufacturing and by servicing our own equipment, which operates in the harshest conditions. We are proud to manufacture quality products with reduced downtime and energy usage, keeping your operations and maintenance costs down.

menu icon

BROAD AND FLEXIBLE EQUIPMENT RANGE

We offer an extensive range of Pumps, Light Towers, Generators and Engines to meet and exceed customer expectations in all market segments.

shopping cart Icon

QUALITY CUSTOMER SERVICE AND AFTERMARKET

Our genuine Parts and Customer Service teams are on hand to make sure you can access qualified, professional and highly skilled technicians when you need them most.

setting icon

STOCK AND MANUFACTURING CAPABILITY

We understand quick turnaround is important to you. That’s why our Light Tower stock program provides you with fast access to equipment solutions when you need the most.

Not sure where to start?

Global Presence

Perth

12 Hoskins Rd, Landsdale WA 6065

Brisbane

28 Gassman Dr, Yatala QLD 4207

Kurri Kurri

125 Mitchell Ave, Kurri Kurri NSW 2327

Melbourne

28-32 Ventura Pl, Dandenong South VIC 3175

Newcastle

42 Munibung Rd, Cardiff NSW 2285

Sydney

26 Mount Erin Rd, Campbelltown NSW 2560

AUCKLAND

CHRISTCHURCH

INDONESIA

Tangerang , Indonesia.

NORTH CAROLINA

11000-A South Commerce B​lvd Charlotte, NC 28273 USA

DUBAI

Plot S 50119 Jebel Ali Free Zone South Dubai, JAFZA

SOUTH AFRICA

Johannesburg, SA Dirk Grobler

Copyright © 2020 AllightSykes. All rights reserved.